Anyone know the current rate for pipeline right of way or lease(which is it)?

I know nothing about this.
Other than that you negotiate something.
Been approached to allow access for survey.
Should we be compensated for the access to do survey or is that unreasonable? Can't imagine measuring being that messy.
Shoudl I spefically tell them to not make a mess or clean it up after the survey?
Do they give you a copy of the survey after its done or do you have to ask?
Once its done, how long before they come with an offer to lay the pipeline.
Saw document on what to negotiate, but I am still reviewing it.
Do you or can you get a payment per year, per qty or volume through the pipe? How else can you benefit from this?
This has no bearing on whether they drill or not?
How long after pipeline does the drilling start?
SE DeSoto Sec 31 11 12.
Where else can I get current info on what to negotiate and for how much?
What about timber, how is that compensated?

Tags: lease, negotiate, of, pipeline, right, survey, way

Views: 358

Replies to This Discussion

Which Mr. Davidson comes highly recommended by numerous shalers? I believe the firm includes the father and two sons. Does one or more of them in particular have extensive oil and gas experience?
Not sure which Mr. Davidson a lot of posters were refering to but Randall Davidson is mentioned in Skip's post. Perhaps you have them confused with The Pesnell Law Firm. They are a father/ 2 sons firm as well. I am sure they are all highly qualified but I have used Billy Pesnell's expertise. Hope this helps.
OOPS. I was confusing the 2 firms. Thanks for the correction.
Wrong Davidson. Randall S. Davidson is the principle in Davidson, Jones & Summers. No sons.

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service