EnCana Spuds 1st Horizontal Haynesville Shale Well in Natchitoches Parish (5/1/10)

EnCana has spudded the first horizontal Haynesville Shale well in Natchitoches Parish and is located in the King Hill Field.  This well is also the first Haynesville Shale well in Natchitoches Parish since the vertical Janet Messenger 8 #1 Well drilled in 2008.

 

EnCana, Semp Russ Pltns 6 #H1 Well, Serial #241008, S7(6)-T10N-R9W

Views: 55

Attachments:

Replies to This Discussion

This will be interesting. Thanks Les.
Hey, doesn't someone win a gold star or medal or cookie or something? LOL
GL, please see the following. I am waiting to see if Keith is working on that Gold Star for Bobi.

http://www.gohaynesvilleshale.com/forum/topics/natchitoches-parish-...
I'm thinking the award should be made at the site with lots of pictures..... LOL
When do you think we will know the flow rate

I wonder if its going to be high or low

Any thoughts
Oree, unfortunately probably not for another six months.

Drill time: 1-2 months
Delay until fracture stimulation: 1-2 months
Fracture stimulation: 1-2 weeks
Time for State to post on Sonrise after test: 2-3 months

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service